<o:smarttagtypenamecountry-regionnamespaceuriurn:schemas-microsoft-com:office:smarttags><o:smarttagtypenameCitynamespaceuriurn:schemas-microsoft-com:office:smarttags><o:smarttagtypenameplacenamespaceuriurn:schemas-microsoft-com:office:smarttags><o:smarttagtypenameStreetnamespaceuriurn:schemas-microsoft-com:office:smarttags><o:smarttagtypenameaddressnamespaceuriurn:schemas-microsoft-com:office:smarttags>

<o:p> 

CURRICULUM VITAE<o:p>

<o:p> 

<o:p> 

NAME:                                                    Stephen Moorhouse<o:p>

<o:p> 


TEL. NOS:                                               MOBILE – 07977 469603<o:p>

<o:p> 

E-MAIL & WEBSITE                              stevemoorhouse4@googlemail.com <o:p>

<o:p> 

NATIONALITY:                                     British<o:p>

<o:p> 

MARITAL STATUS:                               Married<o:p>

<o:p> 

<o:p> 

EXPERIENCE:<o:p>

Nov 08 – Dec 09                                     VARIOUS COMMISSIONS<o:p>

<o:p>PDI Ltd - Site location and pipeline routing exercise for RWE Sidi-Ghazi development in <st1:country-regionw:ston><st1:placew:ston>Egypt – completed.<o:p>

<o:p> 

Saipem <st1:country-regionw:ston><st1:placew:ston>UK Ltd – Pipeline landfall study Bacton – submitted.<o:p>

<o:p> 

Composite Energy – Coal Bed Methane exploration site preparation supervision – completed.<o:p>

<o:p> 

January 08 – Nov 08                                             LAND & MARINE ENGINEERING<o:p>

                                                                                Position – Project Manager<o:p>

                                                                                Project – <st1:placew:ston>Stirling Reinforcement Pipeline <o:p>

<o:p> 

Project Managing the design and construction of a 4.5 Km x 8” high pressure gas pipeline for SGN a local utility company.<o:p>

<o:p> 

EUROPA OIL & GAS LTD<o:p>

<o:p> 

Prepared and lodged planning applications for 2 existing oil/gas production sites, and one new exploration site.  <o:p>

<o:p> 

J P KENNY – <st1:placew:ston>Staines<o:p>

<o:p> 

Commissioned by JPK, the BP Project Management Company to prepare a report for the refurbishment of the Wytch Farm pipeline system.<o:p>

<o:p> 

Report reviewed and advised on the JPK proposed scope of works, method statements and design, constructability and health and safety issues.<o:p>

<o:p> 

<o:p> 

January 07 – October 07                      COMPOSITE ENERGY<o:p>

                                                                                Position: Pipelines Manager<o:p>

                                                                                Project:  AIRTH & LONGANNET CBM PROJECTS<o:p>

<o:p> 

Responsible for planning for the construction of a series of inter-field pipelines, power cables and communications cables connecting a number of drill sites for the development of a Coal Bed Methane (CBM) recovery project.<o:p>

<o:p> 

<o:p> 

<o:p> 

October 05 – January 07                      GASUNIE - BBL COMPANY<o:p>

                                                                                Position: CLIENTS SITE REPRESENTATIVE - BACTON<o:p>

                                                                                Project: BALGZAND – BACTON PIPELINE PROJECT<o:p>

<o:p> 

Monitoring and reporting to BBL management on all activities associated with the <st1:country-regionw:ston>UK construction element of the pipeline connecting <st1:cityw:ston>Holland and <st1:country-regionw:ston><st1:placew:ston>Britain. <o:p>

Including - construction of offshore pipeline landfall, onshore pipeline, and facilities within Shell and National Grid (Transco).<o:p>

<o:p> 

  <o:p>

<o:p> 

October 02 – Sept 05                                            STAR ENERGY (<st1:placew:ston>EAST MIDLANDS) LTD<o:p>

                                                                                Position: CONSULTANT<o:p>

                                                                                Project: ONSHORE PIPELINES<o:p>

<o:p> 

Carrying out desk top and feasibility studies for onshore pipelines, to connect proposed gas storage facility with NG national transmission system. Included, route selection, compilation of book of reference, preparation and submission of planning applications, liaison with local authorities and public and statutory bodies.<o:p>

<o:p> 

<o:p> 

June 01 – Feb. 02                                  GENESIS OIL & GAS<o:p>

                                                                                Position: ONSHORE PIPELINES CONSULTANT<o:p>

                                                                                Project:   RIVERS PIPELINES<o:p>

<o:p> 

Defining onshore pipeline route, and contributing to definition of landfall and onshore elements of FEED and ITT documents for Clients to let an EPIC contract.<o:p>

<o:p> 

Preparation and submission of Planning Applications for construction of:
Onshore Pipeline,
Terminal Temporary Construction Site,
Temporary Pipeline Fabrication Area,
New Terminal.

A 24" pipeline will bring gas from the Irish Sea Rivers fields to a purpose built reception terminal at Barrow-in-Furness <st1:country-regionw:ston><st1:placew:ston>Cumbria<o:p>

<o:p> 

<o:p> 

<o:p> 

October 00 – June 01                           FPDSAVILLS<o:p>

                                                                                Position: CROSSINGS COORDINATOR<o:p>

                                                                                Project: 186k FIBRE OPTIC SYSTEM<o:p>

<o:p> 

Identifying third party equipment, and securing the necessary permissions for crossing for a nation-wide fibre optic cable route. Liasing with local authorities, Highways Agency, Environment Agency, and Utilities Owners to facilitate crossings. Preparation and delivery of information packs for construction companies.<o:p>

<o:p> 

<o:p> 

<o:p> 

February 00 – July 01                           ONSHORE EXPLORATION COMPANIES<o:p>

                                                                                <o:p>

Position: CONSULTANT<o:p>

                                                                                Project: LOCAL ONSHORE EXPLORATION<o:p>

<o:p> 

Carrying out desk top and feasibility studies for onshore oil and gas field developments. Identifying and negotiating for possible drill sites and pipeline routes. Preparation and submission of planning applications, liaison with local authorities and public and statutory bodies.<o:p>

<o:p> 

<o:p> 

May 1999 – December 99                     ROC OIL (<st1:country-regionw:ston><st1:placew:ston>UK) LIMITED<o:p>

                                                                                <o:p>

                                                                                Position: PROJECT MANAGER<o:p>

                                                                                Project: SALFLEETBY GAS FIELD DEVELOPMENT<o:p>

<o:p> 

Managing the fast track design, procurement and construction of 2.5 Km - 6”ultra-high pressure pipelines connecting 2 onshore gas production sites, and 7.5 Km -10” high pressure export pipeline to the Conoco gas terminal.<o:p>

Assembled a design and management team from selected company and contract sources. Safety, commercial and planning responsibility for the project, which was completed without any lost time accidents, on programme and within budget.<o:p>

Prepared and submitted Major Accident Prevention Document (MAPD) to Health and Safety Executive.<o:p>

 <o:p>

<o:p> 

<o:p> 

<o:p> 

<o:p> 

October 1997 – April 1999                   ELF EXPLORATION UK PLC<o:p>

<o:p> 

                                                                                Position:  CLIENTS SITE REPRESENTATIVE - Bacton<o:p>

                                                                                Project: SHEARWATER-ELGIN/FRANKLIN <o:p>

<o:p> 

Landfall-Monitoring, and reporting on, all site activities during the construction of a 20 m shaft, 820m tunnel, and tunnel beach cofferdams, pipeline pull ashore and pipeline fabrication and tunnel pull through. Responsible for maintaining Elf’s good relationship with residents and businesses in a sensitive holiday area.<o:p>

Pipeline-Assisted the Design Engineers in the development of specifications and contract documents. Transferred to lead the Elf site team, managing the construction of the onshore pipeline element of the project.<o:p>

Responsible for day to day liaison with engineers, contractors, operators, landowners, planning authorities and statutory bodies.<o:p>

<o:p> 

<o:p> 

<o:p> 

March 1997 – September 1997            CANDECCA RESOURCES LIMITED<o:p>

                                                                                AMERADA TECHNICAL SERVICES LIMITED<o:p>

<o:p> 

                                                                                Position:  CONSULTANT<o:p>

                                                                                Project:    PROPOSED PIPELINES (Local)<o:p>

<o:p> 

Carrying out conceptual designs, including route selection, landowner referencing and pipeline sizing.  Estimating design, procurement and construction costs.  Submitting statutory notifications to DTI and HSE.<o:p>

<o:p> 

<o:p> 

July 1995 – June 1996                          BP EXPLORATION OPERATING COMPANY LTD.<o:p>

<o:p> 

                                                                                Position:  PROJECT MANAGER<o:p>

                                                                                Project:    FURZEY ISLAND S/W INJ. SYSTEM<o:p>

<o:p> 

Managing the design and construction of a sea water abstraction and injection system on Furzey Island in Poole Bay. The project was subjected to stringent environmental planning conditions, with various construction activities programmed to fit severely restricted time windows.  The system included a short pipeline and associated well site deaeration and chemical dosing surface <o:p>

facilities.<o:p>

<o:p> 

March 1994 – September 1994            BP EXPLORATION OPERATING COMPANY LTD.<o:p>

<o:p> 

                                                                                Position:  CONSTRUCTION MANAGER<o:p>

                                                                                Project:    WYTCH FARM STAGE 3 DEVELOPMENT<o:p>

<o:p> 

Managing the installation of 5km’s of twin 11kv cable and an 8” high pressure steel water injection pipeline sharing a joint trench in an environmentally sensitive area.  The route is on the Goathorn Peninsular in Poole Bay and crosses a heath land SSSI, two salt marsh SSSI’s and an area of particular archaeological interest.  The route and construction techniques were selected to mitigate environmental impact.<o:p>

<o:p> 

Full safety, commercial and planning responsibility for the project, which was completed without any lost time accidents, on programme and under budget.<o:p>

<o:p> 

<o:p> 

January 1994 – July  1995                   GRIMSBY COLLEGE OF TECHNOLOGY<o:p>

<o:p> 

Part-time attendance studying for National Examination Board in Occupational Safety & Health qualifications. <o:p>

<o:p> 

<o:p> 

June 1993 – December 1993                                BRITISH PIPELINE AGENCY LIMITED<o:p>

<o:p> 

                                                                                Position: CONSTRUCTION SUPERVISOR<o:p>

                                                                                Project:  T.H/S.W. PIPELINE REVALIDATION<o:p>

<o:p> 

Supervising the location, removal and replacement of sections of reduced wall thickness pipe from an existing pipeline.<o:p>

<o:p> 

May 1991 – December 1992                 ESSO PETROLEUM COMPANY LIMITED<o:p>

<o:p> 

                                                                                Position:  CLIENTS REPRESENTATIVE/PIPELINE<o:p>

                                                                                                                CONSTRUCTION SUPERINTENDENT<o:p>

Project:                    BIRMINGHAM AIRPORT LINK – 52km 12” multi-product pipeline.    <o:p>

<o:p> 

Acting as one of the client’s representatives at the Engineers premises during the design phase and at British Steel during linepipe production and coating.  Transferred to site on commencement of Phase One construction, reporting to Esso Resident Engineer on activities of Engineers and Contractors.  Member of Client/Engineer integrated project team during Phase Two of construction.<o:p>

<o:p> 

<o:p> 

<o:p> 

March 1991 – May  1991                                       JOHN BROWN ENGINEERING AND CONSTRUCTION LIMITED<o:p>

<o:p> 

                                                                Position:  PRINCIPAL PIPELINE ENGINEER<o:p>

Project:                    ENRON TEESIDE PIPELINE – 16km 24” 11km <o:p>

8” <o:p>

                                                                                <o:p>

Reporting to the Project Manager and liaising with ICI in order to establish an acceptable route through the chemical plant.  Supervising the surveying of the route and the production of detailed and typical construction drawings and involved in the preparation of construction specifications.<o:p>

<o:p> 

<o:p> 

<o:p> 

Sept. 1985 – Dec. 1990                          BP PETROLEUM DEVELOPMENT LIMITED<o:p>

<o:p> 

                                                                                Position:  PROJECT ENGINEER<o:p>

Project:                    ON-SHORE OIL AND GAS DEVELOPMENTS <o:p>

<o:p> 

Reporting to the Head of Engineering UK Lands. Responsible for the installation of pipelines and the construction of surface facilities for the collection and transportation of crude oil from onshore developments.<o:p>

Duties included:-<o:p>

<o:p> 

Review of designs and specifications.<o:p>

Determining pipeline routes and consultations with affected parties.<o:p>

Liaison with Department of Energy Pipeline.<o:p>

Inspectorate and Local Authorities.<o:p>

Consultations with landowners and occupiers.<o:p>

Contractor pre-qualification exercises and bid assessments.<o:p>

Day to day construction management with total responsibility for safety, costs and programme on all projects during this period.<o:p>

<o:p> 

<o:p> 

<o:p> 

<o:p> 

October 1984 – September 1985         ESSO PETROLEUM COMPANY LIMITED<o:p>

<o:p> 

                                                                                Position:  QA/QC ENGINEER/CLIENTS REP.<o:p>

Project:                    MIDLINE DEVELOPMENT – 220km 14” diameter multi-product pipeline.<o:p>

Supervision during linepipe manufacture and coating in West Germany and U.K.<o:p>

Reporting to the Esso Project Manager on the activities of<o:p>

the Engineering Company, Inspection Companies<o:p>

and Contractors on three separate contracts during<o:p>

pipeline construction.  Auditing QC systems and procedures.<o:p>

<o:p> 

<o:p> 

<o:p> 

January 1984 – Aug. 1984                    BRITISH PIPELINE AGENCY LIMITED<o:p>

<o:p> 

                                                                                Position:  RESIDENT ENGINEER<o:p>

                                                                                Project:    EXISTING PIPELINE             <o:p>

<o:p> 

                                                                                Supervising the location and replacement of defective bends.<o:p>

<o:p> 

1983                                                                                                            SHELL / ESSO PETROLEUM<o:p>

<o:p> 

Position:  SENIOR INSPECTOR<o:p>

Project:    FLAGS LINE<o:p>

<o:p> 

1983                                                                                                            SOUTHERN GAS<o:p>

<o:p> 

Position: RESIDENT ENGINEER<o:p>

<o:p> 

1982                                                                                                            CEMENTATION PIPELINES<o:p>

<o:p> 

Position:  SENIOR INSPECTOR<o:p>

                                                                                Project:    SALTEND – EASINGTON PIPELINE:<o:p>

<o:p> 

<o:p> 

                <o:p>

<o:p> 

1981 – 1982                                                            ESSO PETROLEUM COMPANY LIMITED<o:p>

<o:p> 

                                                                                Position:  CLIENT REPRESENTATIVE<o:p>

                                                                                Project:    SOUTHEAST PIPELINE<o:p>

<o:p> 

1975 – 1981                                                            BRITISH GAS<o:p>

<o:p> 

                                                                                Position:  SENIOR PIPELINE INSPECTOR<o:p>

                                                                                Project:    VARIOUS<o:p>

<o:p> 

1968 – 1975                                                            SHORT TERM CONTRACTING FOR MECHANICAL ENGINEERING COMPANIES<o:p>

<o:p> 

<o:p> 

1962 – 1968                                                            ENGLISH ELECTRIC COMPANY LIMITED<o:p>

<o:p> 

                                                                                INDENTURED MECHANICAL ENGINEERING APPRENTICE<o:p>

<o:p> 

<o:p> 

<o:p> 

<o:p> 

QUALIFICATIONS                                               Institute of Occupational Safety & Health- Tech IOSH<o:p>

                                                                                National Gen. Cert. Occupational Safety & Health <o:p>

                                                                                ERS Approved Senior Welding Inspector (expired)<o:p>

                                                                                Member Pipeline Industries Guild<o:p>

                                                                                City & Guilds Mechanical Engineering<o:p>