 |  |
 |  |  |  |  |  |  |  |  | | Near shore dredging to allow pipeline pull ashore |
|
 |  |  |  |  |  |  |  |  | | Construction of reception cofferdam for offshore pipeline to be winched into from laybarge |
|
 |  |  |  |  |  |  |  |  | | Pipeline winched ashore in to cofferdam from offshore laybarge |
|
 |  |  |  |  |  |  |  |  | | Preparation of pull ashore cofferdam |
|
 |  |  |  |  |  |  |  |  | | Preparation of pull ashore cofferdam |
|
 |  |  |  |  |  |  |  |  | | Beach winches set up for pipeline pull ashore |
|
 |  |  |  |  |  |  |  |  | | Beach cofferdam construction |
|
 |  |  |  |  |  |  |  |  | | Tie-in pull ashore pipeline to beach pipeline |
|
 |  |  |  |  |  |  |  |  | | Pipeline in beach to shaft connecting tunnel |
|
 |  |  |  |  |  |  |  |  | | Riser pipeline fabrication in shaft |
|
 |  |  |  |  |  |  |  |  | | Welding shaft riser fabrication to beach/shaft tunnel pipe |
|
 |  |  |  |  |  |  |  |  | | Tyng-in shaft riser pipe to cliff top surface pipeline |
|
 |  |  |  |  |  |  |  |  | | Setting up tie-in for shaft to Shell connecting pipeline |
|
 |  |  |  |  |  |  |  |  | | Tie-in cliff top surface pipeline to pre-installed Shell plant pipeline under security fence |
|
 |  |  |  |  |  |  |  |  | | Pipeline threaded into NG fence and SILK pipeline crossing tunnel |
|
 |  |  |  |  |  |  |  |  | | Bespoke pipeline/tunnel insulators fitted with skids |
|
|
|
|